Monday, April 26, 2010

a milestone passed

Since the last post:
tile in
grouted
sealed
caulked
fixtures assembled
water turned on!!!
shelves installed


The new storage area with shelves in the background.
The bath/shower ready for the first bathing.

1 comment: